A transition to renewable energy is imperative for our planet, and the good news is that Virginia has taken a major step in that direction with the ambitious Virginia Clean Economy Act (VCEA) passed in 2020. The VCEA requires that Dominion Energy build 16.1 gigawatts (GW) of solar and wind energy in the public interest by 2035 and operate with 100% renewable energy by 2045. Recent studies by the University of Virginia tell us we are well on our way. However, a history of poorly designed solar projects in Virginia have made it clear that utility-scale solar can have significant hidden costs if not done well.
Small-scale solar

Shining a Light on Agrivoltaics at Roundabout Meadows
This spring, the Piedmont Environmental Council will unveil a project at our Community Farm at Roundabout Meadows with the potential to revolutionize the relationship between the agricultural lands that make up the heart of the Virginia Piedmont and the need for more solar energy capacity across the Commonwealth.

General Assembly Snapshot: 2025
The General Assembly convenes on Jan. 8 for a planned “short session” that runs through Feb. 22. PEC has co-authored several white papers that form the framework of the Virginia Conservation Network’s legislative priorities.

Solar for Rural Businesses Workshop Resources – May 7, 2024
On May 7, 2024, PEC hosted a workshop called “Solar for Rural Businesses: Accessing Funding for Small-Scale Solar” in Albemarle County.