HUNTLY, VA: Recent work at Sprucepine Branch reconnected 2 miles of stream, as a set of culverts were removed from a private driveway, and replaced with a bridge. PEC coordinated with the U.S. Fish and Wildlife Service and Shenandoah Streamworks on the natural channel design and construction. The work included re-grading stream banks and in-stream structures that restored the natural hydrology of those streams.
The Virginia Department of Game and Inland Fisheries provided pre and post fish community monitoring.